| Sl.No |
Description |
Contractor/Consultant/ Customer |
Project Reference |
Status |
| |
|
|
|
|
| 1 |
Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -30nos |
CCC GmbH, Germany/DEWA |
CE/207B/2009 |
July-09 |
| |
Dubai Mall S/S-3nos, Garden Group 1-3nos, Al Mamzar -3nos,Old Town-3nos, Garden-Group 2-3nos, Estihmar-Group2-3nos., BRES - Group 1-3nos, SK Zayed Road Tower3nos, Old Town Group 2-3nos, Burj Dubai-3nos. |
|
|
|
| 2 |
Installation of 11kV Indoor cable termination kit |
ETA Star International -Dubai |
Emirates Aluminium |
August-09 |
| 3 |
Supply & Installation of 33kV,1Cx1200sqmm Cu,PILC cable |
Danway-Dubai |
DUBAL |
July-10 |
| 4 |
Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -12nos and 132kV TRF S/E -12nos |
CCC Germany /ETA /DEWA |
CE/288C/2007- Silicon Oasis S/S |
August-09 |
| 5 |
Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -30nos |
CCC GmbH, Germany/DEWA |
CE/207B/2009 |
August-09 |
| 6 |
Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -9nos and 132kV TRF S/E -9nos |
CCC GmbH, Germany/DEWA |
CE/288C/2007-Dhiyafa 132kV S/S |
September-09 |
| 7 |
Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -30nos |
CCC GmbH, Germany/DEWA |
CE/207B/2009 |
December-09 |
| 8 |
132kV Cable shetah testing , sheath fault location & Repairing |
AREVA |
132kV JARA S/S |
October'09 |
| 9 |
Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -9nos and 132kV TRF S/E -9nos |
CCC GmbH, Germany/DEWA |
132KV -BOHAIRAH S/S |
Nov'09 |
| 10 |
Design & Engineering works for 132kV XLPE cable route & accessories |
NCC Abudhabi/ADCO |
ADCO PROJECT No:14333 |
Octtober 2010 |
| 11 |
LV & 22kV Cable Installation |
Alpha Power Electro Mechanical Contracting LLC, Consultant-OGER, Manin Contractor-THERMO |
ADFC - Abu Dhabi |
October-10 |
| 12 |
11kV & 33kV Cable termination |
ADDC |
Al Zarooni Electro Mechanical LLC |
October-10 |
| 13 |
Design & Engineering works for 132kV XLPE cable route & accessories |
National Contracting Co Ltd |
ADCO PROJECT No:14333 |
October-10 |
| 14 |
Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -15nos and 132kV TRF S/E -15nos |
CCC GmbH, Germany/DEWA |
CE/107A/2007 -Lost City Substation |
January-10 |
| 15 |
Installation of 11kV Indoor cable termination kit & cable testing |
Bin Ghalib |
|
April-10 |
| 16 |
Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -15nos and 132kV TRF S/E -15nos |
CCC GmbH, Germany/DEWA |
CE/107A/2007 -Lost City Substation |
December-09 |
| 17 |
Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -21nos and 132kV TRF S/E -21nos |
CCC GmbH, Germany/DEWA |
NAS/A608/2007 , SHBA S/S & Qaryat Jemirah S/S |
April'10 |
| 18 |
11kV Cable installation from Substation -8 to common utilities Tunnel to RMU Rooms to Transformers , inclding termination , Jointing & CIVLE WORKS - Cable laying 56KM, civil work 3kM |
Total Electrical & Mechanical LLC |
Proposed evelopment & construction of Nad Al Sheeba Race course on parcel ID 600 6888 for M/S Meydan |
February-10 |
| 19 |
132kV Cable route design works |
NCC Abudhabi/DEWA |
DEWA Contrcat # CNE/0209/2009- Under grounding of 132kV OHL |
September-10 |
| 20 |
Installation of 132kV cable including , civil works , LV, HVAC & PD test of 132kV cable - C132kV cable 6000mt, ODSE-24nos |
NCC Abudhabi/DEWA |
DEWA Contrcat # CNE/0209/2009- Under grounding of 132kV OHL |
April'10 |
| 21 |
11kV cable diversion work at AlWarka 4 |
TUNB Building Contg |
Al Warka -4 |
March-10 |
| 22 |
LV Cable laying |
ARAR Utility company LLC |
Dubai Metro Green Line at Al Quasais Depot |
April-10 |
| 23 |
11kV cable diversion work at DREC Villa Project |
Al Shafar General contracting LL |
DREC Villa Project |
April-10 |
| 24 |
132kV Cable installation with Supports |
AREVA |
400kV/132kV S/S t Al Barsha -CE/496A/2007 |
September-10 |
| 25 |
11kV cable diversion work at DIERA Project |
Islamic Affair & Charitable Activities Deaprtment |
|
October-10 |
| 26 |
11kV & 33kV cable joints |
Prime Electromechanical |
|
May-10 |
| 27 |
Installation of 11kV termination kit -14nos |
Al Mirza Electro M Cont Est.echanical |
|
May-10 |
| 28 |
Installation of LV cantrol cable |
Danway |
EMAL |
May-10 |
| 29 |
11kV Cable diversion work |
Herald Contractiong Co LLC |
R503 Emirates hills 2nd Village Phase2 (Plot 388-101) |
August-10 |
| 30 |
LV cable work |
Al Tatwir Contracting L.L.C |
Site C-180- Al Khawneej |
August-10 |
| 31 |
11kV cable diversion work & demolition of SS at DREC Villa Project |
Al Shafar General contracting LL |
DREC Villa Project |
April-10 |
| 32 |
11, 22kV Cable Termination & Tetsing |
Lamprell |
CN/09/1102 - Aquila Top Sided Modules |
September-10 |
| 33 |
LV & 22kV Cable Installation |
Appha Power Electro Mechanical Contracting LLC, Consultant-OGER, Manin Contrcator-THERMO |
ADFC - Abu Dhabi |
October-10 |
| 34 |
Demolition of substation 531 and Relocation of Existing HV-LV cable on the plot 353-201 |
Al Shafar General contracting LL |
DREC Villa Project |
September-10 |
| 35 |
Installation of 3.3kV indoor termination |
Emirates Electrical & Instrumentation LLC |
ADMA OPCO, Das Island Abu Dhabi |
September-11 |
| 36 |
Installation of 3.3kV indoor termination & testing |
Emirates Electrical & Instrumentation LLC |
ADMA OPCO, Das Island Abu Dhabi |
September-11 |
| 37 |
11kV & 33kV Cable termination , 11kV -25nos, 33kV-6nos |
Al Zarooni Electro Mechanical LLC |
|
October-10 |
| 38 |
Installation of ODSE for 132kV, 630sqmm cU XLPE cable -6nos |
CCC GmbH, Germany/NCC/DEWA |
DEWA Contrcat # CNE/0209/2009- Under grounding of 132kV OHL |
November-1 0 |
| 39 |
Installation of 33kV , 3Cx400sqmm PILC - XLPE Transition Joint |
GEECO Mechanical & Electrical Limites |
DEWA |
April-11 |
| 40 |
11kV Cable testing |
ARCHIRODON Constrcution (Overses) Co S.A , Abu Dhabi |
Mirfa 1 sea water intake & outfall project |
December-10 |
| 41 |
Suuply & installation of 33kV Cable Joints - 1200sqmm - 500sqmm |
Danway Elecrical & Mechanical Engg LLC |
Dubal |
Februry 2011 |
| 42 |
Installation of 132kV,1200sqmm -720mtr, 220kV,1200sqmm Cu XLPE cable -600mtr |
AREVA , Dubai |
Dhaid V04 S/S |
September- 11 |
| 43 |
Cable trench for 11kV cable work -Route lenght - 3300mtr, Cable laying- 6820mtr, Supply of 11kV cable - 620mtr |
Kazarooni Co LLC |
Roads infrastrcuture for Jumeirah heights |
December- 11 |
| 44 |
Installation of 3.3kV indoor termination & testing-48nos |
Emirtaes Electrical & Instrumnetatio LLC |
ADMA OPCO, Das Island Abu Dhabi |
September-11 |
| 45 |
Design, Supply & installation of Steel structure & foundation 132kV & 66kV - ODSE -24nos & SA- 30nos |
Jazeera Emirates Power , Dubai-UAE |
Qatar Power Transmission System Expansion Phase 9 - Substation (GTC/240) |
December-11 |
| 46 |
Installation of 132kV & 66kV GIS S/E & ODSE-150nos and LV & HVAC testing - 25ckts |
Jazeera Emirates Power , Dubai-UAE |
Qatar Power Transmission System Expansion Phase 9 - Substation (GTC/240) |
December-11 |
| 47 |
Installation of 132kV & 11kv cables,installation of 11kv cable termination kit |
AREVA , Dubai |
BIRD 132/11kV S/S |
March-12 |
| 48 |
Cable trench for 11kV cable work -Route lenght - 1200mtr, Cable laying- 2500mtr |
Dubai Sports City |
Cana residence West (Phase-1) |
March-12 |
| 49 |
Installation of 11kV cable - 1,625mt & Cable trench -800 mtr |
Dubai Festival City |
11kV power supply to offices on plot no. 412-108 (Z14A.00)- Substation PK 10217 |
October-11 |
| 50 |
Power, Instrumentation ,Earthing cable Laying |
Danway Elect. & Mech. Engg LLC |
Inter refinery Projects IRP -II ,Musaffah Terminal Packages, Abu Dhabi |
July-12 |
| 51 |
S/S Metering Project |
Afaq Al Khaleej |
ADDC CONTRACT NO # D 102251 /A |
February-12 |
| 52 |
3.3kV Cable Supply / Termination / Testing |
METITO (Overseas) Ltd |
|
November-12 |
| 53 |
3.3 kV Cable Termination and Installation |
AL MAHASIN Elect .Cont.Co.LLC |
|
December-12 |
| 54 |
33kV OHL From Bu Hasa to Bida al Qemzan |
National Contracting Co Ltd |
ADCO PROJECT 33kV OHL |
December-12 |
| 55 |
132 KV Cable & Installation of terminations |
Siemens |
NPCC - Quashwara |
November-12 |
| 56 |
11 kV Cable Fault Locating |
Gulf Industrial Services Co -GISCO-LLC |
GISCO- Abu Dhabi |
July-12 |
| 57 |
Installation Of Heat Shrink Termination |
Al-Hasoun Sejong |
Fertil - Ruwais |
December-12 |
| 58 |
Installation of Cable Joints & Termination |
GS Engineering & Construction |
Takreer - RRE3 Project |
December-12 |
| 59 |
Diversion of HV, 132kV Pilot and FO cable and installation of HV cable, FO, Pilot cable jointing kit including supply of cable. Route length 1,100mtr |
Kazarooni Co LLC |
Access Road for Filling Station at Jebel ali |
March-12 |
| 60 |
Installation of 132kV, 1Cx630 Sq.mm cable , Support Structure-1340 Mtr,Link box, Bonding Cable laying & termination works |
Alstom Grid, Dubai-UAE |
DEWA Contract no: CE/716/2008,in the substation of LBAC, MCLB,KWNJ,OMTN,-Dubai-UAE |
Februry-2012 |
| 61 |
Bentonite filling for 132kV cable duct |
Alstom Grid, Dubai-UAE |
DEWA Contract no: CE/716/2008,in the substation of LBAC, MCLB,SKLN,KFAF,KWNJ,OMTN,JAIN,WHSP-Dubai-UAE |
Februry-2012 |
| 62 |
Installation of 11kV calbe and installation of jointng works for School and Two Towers at Plot No: 682-125, 682-159 & 682-4197.. Route length - 1,580 mtr |
Dubai Sports City |
Contract No: DSC/P5/D&B007/11 , DEWA CAR No: CAR/DP/D/0084/2011 & CAR/DP/D/1093/2009 |
December-11 |
| 63 |
Installation of 132kV 48F, FO cable,& erection of Concrete trough as per DEWA standard-trench lenth 650 mtr |
National contracting Co.Ltd , abudhabi |
DEWA Contract: CNE/005C/06/VO |
December-11 |
| 64 |
Supply & Installation of 132kV pilot cable works |
Salini Dubai Branch, costruttori spA- Dubai-UAE |
Ras al khor crossing(comprehensive improvement of interchange no.1 on Shk.zayed road |
April-12 |
| 65 |
Installation of 11kV cable in the conctete trench - 500mtr |
Hennessey L.L.C-Dubai-UAE |
Westin hotel-Refurblashment |
December-11 |
| 66 |
Installation of 11kV cable -270 mt & Cable trench -155 mtr |
Dubai Festival City |
DN131- Sitewide infrastructure service Al Badia Phase III, 11kV Power supply to Zone 12B- S/S 10061 |
February-12 |
| 67 |
Installation of marine cable termination kit for 8.5/15kV, 1Cx150 Sq.mm- 120 Nos, 1Cx120 Sq.mm - 48Nos, 1Cx95 Sq.mm - 42Nos, |
Lamprell Engery Pvt. Ltd-Dubai-UAE |
WTI JACK-UP VESSEL NG9000-HPE in JAFZA |
October-12 |
| 68 |
Installation of 11kV cable -570 mt & Cable trench -340 mtr |
Dubai Festival City |
DN141- Sitewide infrastructure service for Toyota service centre 11kV Power supply to Zone 12A- S/S 13126 |
June-12 |
| 69 |
Installation of 132kV GIS- S/E - 18 Nos,ODSE -S/E-18 Nos, 132kV,1Cx630 Sq.mm Jointing kit- 18 Nos |
Power Magic- Dubai-UAE |
Contract No: 6734 Inabensa, 132kV OHL Fujeairah- Dibbah/Fujairah-Tayween LOT-1 |
On going |
| 70 |
Installation of HV Cable laying work - RC - 1 (15009) |
GDC |
RC - 1 (15009) installation of HV Cable at DWC |
June-12 |
| 71 |
Installation of HV Cable laying work |
GDC |
RC - 2 (15010) Installation of HV cable at DWC |
August-12 |
| 72 |
Installation of Hv cable laying work |
Target Engineering Construction |
P- N004-060-02 Package-1 Nakheel Jumeria Island Heights |
On going |
| 73 |
Supply and installation of 11kV, 3Cx300 Sq.mm, 400 Sq.mm, 400 Sq.mm, 185 Sq.mm jointing and termination kit - 89 Nos |
Al Naboodah - Dubai - UAE |
A X SP 100 - Miscellaneous airfield works |
On going |
| 74 |
Installation of marine cable termination kit for 8.5/15kV, 1Cx150 Sq.mm- 3 Nos, HVDC,IR,Phase Check test |
Lamprell Engery Pvt. Ltd-Dubai-UAE |
CN/10/1105- Living Quarters & Utility Platforms |
June-12 |
| 75 |
Supply & Installation of Transition jointing kit suitable for 1Cx1000 to 1Cx1200, 1Cx1200 to 1Cx800 - 14 Nos |
Danway - Dubai - UAE |
DUBAL |
June-12 |
| 76 |
Installation of terination kit of 11kV, 3Cx300 Sq.mm |
Dhafir Switchgear, Dubai - UAE |
SIMOSEC Panels at BBET |
May-12 |
| 77 |
Installation of transition joint for 33kV,1Cx95Sq.mm, Cu/XLPE to 1Cx95 Sq.mm, PILC lead sheath |
Danway - Dubai - UAE |
DUBAL |
June-12 |
| 78 |
Installation of 8.5/1.5kV, 3Cx150 Sq.mm marine cable termination kit |
Lamprell Energy Ltd - Dubai - UAE |
CN/10/1105 - Living Quarters & Utility platforms |
May-12 |
| 79 |
Cut & Diversion of cable for 11kV,4Cx240 Sq.mm cable 150mtrs |
ETA Mechanical & Electrical Division |
Laying of 11kV cable at 132/33kV DEWA S/S near DLC at jebel ali |
Mayl12\ |
| 80 |
Excavation under the 132kV trough to facilitate to lay 500&200 Dia storm water pipe & Sewage pipe |
GDC - Dubai - UAE |
GDC - LC2 (044) |
June-12 |
| 81 |
Installation of transition joint for 33kV,1Cx800 Sq.mm, Cu/XLPE to 1Cx1200 Sq.mm, PILC lead sheath - 9 Nos & 33kV, 1Cx1000 Sq.mm, Cu/XLPE to 1C x 1200 Sq.mm, PILC lead sheath - 3 |
Danway - Dubai - UAE |
DUBAL |
August-12 |
| 82 |
Supply and Installation of 2 Bolt cable cleat suitable for 11kV,3Cx300 SQ.mm cable OD-85MM - 300 Nos |
ETA -Dubai UAE |
GDC - LC2 & LC1 |
August-12 |
| 83 |
Supply of Termination kit suitable for 3Cx300 Sq.mm - 60 Nos (Make: Raychem) |
Al Naboodha -Dubai-UAE |
Dubai Air port Project-AXSP100 MEP Works |
December-12 |
| 84 |
Supply of Jonting and Termination kit for 11kV,3Cx300 Sq.mm- 39 Nos (Make: nKT Cable) |
Al Naboodha -Dubai-UAE |
Jebel Ali Airport Project |
October-12 |
| 85 |
Cable Cut and Diversion for 11kV,3Cx240 Sq.mm cable at Mirdihf - Dubai-UAE |
SAM Building Contracting L.L.C |
P846 Geant |
On going |
| 86 |
Design, Manufacture, Supply, Installation testing and commissioning of 132kV cables and Accessories as per TRANSCO specification & Reuirements for New 220kV GIS Qusahwira Project |
Siemest Energy sector- Power transmission |
130P-03006/H-040/FOF/MR |
On going |
| 87 |
PVC Pipe cable entry sealent works |
ETA -Dubai UAE |
GDC - LC2 & LC1 |
September-12 |
| 88 |
Supply & Installation of 132kV pilot cable works |
EEE -Dubai-UAE |
DEWA- CE/0348B/2010 |
September-12 |
| 89 |
Supply,Installation & Testing of Pilot cable joints |
Power Magic- Dubai-UAE |
R842/4 Improvements of AlKhail Rd, Junction - 17 |
November-12 |
| 90 |
Supply & Installation of 11kV,3Cx50 Sq.mm Cu/XLPE Termination kit-17 Nos, 11kV, 3Cx120 Sq.mm Cu/XLPE-20 Nos |
Voltas- Dubai-UAE |
DIFC-Project Office |
November-12 |
| 91 |
Shifting of 132kV LinkBox & Testing of Bonding Cable after termination |
Emirates Roads Contracting LLC |
R881/2A Comprehensive of the Parallel Roads |
On going |
| 92 |
Supply ,Installation,Testing & Commisioning of Transformer and Ring Main Unit |
Al Futtaim Engineering |
Aviation Hanger Dubai World Center |
March-13 |
| 93 |
11kV HV Cable laying with Civil work |
TOA Corporation |
T3-Q10 Container Terminal (Jeball Ali) |
December-12 |
| 94 |
132kV Cable trough Protection work |
Khansaheb Civil Engineering |
AL Furjan Road & Insfrastructure Phase 1 |
On going |
| 95 |
Excavation, concrete surround existing of 2 Nos of 132kV cable trough including supply & installation of cover slabs 0.5mtr(L) x 5Mtr (W) x 0.25mtr (T) and backfilling the same upto ground level |
ETA -Dubai UAE |
DCP District cooling |
On going |
| 96 |
Installation of 33kV, 3Cx400 Sq.mm, XLPE, Straight through cable joint kit - 4 Nos |
Al Reyami -Dubai- UAE |
Trade centre Road projects |
December-12 |
| 97 |
Cut & Diversion of cable for LV,4Cx 240 Sq.mm cable 150mtrs |
NationalPiling -Dubai-UAE |
3B+G+7P+19 Storey office building on plot No. D-001-004 @ Tecom, Dubai-UAE |
January-13 |
| 98 |
Installation of Termination kit suitable for 3Cx300 Sq.mm - 60 Nos (Make: Raychem) |
Al Naboodha -Dubai-UAE |
Dubai Air port Project-AXSP100 MEP Works |
On going |
| 99 |
Installation of 33kV, 3Cx400 Sq.mm, XLPE, Transition joint kit & Termination kit - 4 Nos, 33kV,3Cx240 Sq.mm Straight Through joint kit and termination kit -4 Nos, 33kV,10 pair pilot cable jointing kit-4 Nos. |
GECO Mechanical & Electrical LTD |
CE/0589/2009-Construction of 33kV switching station inside the jebel ali power station |
On going |
| 100 |
Supply of 11kV,3Cx300 Sq.mm Jointing kit with water block tube |
Al Naboodha -Dubai-UAE |
Dubai Air port Project-AXSP100 MEP Works |
February-13 |
| 101 |
Reeling and Removing of 11kV cable |
GTCC-Dubai-UAE |
T3-Q10 Container Terminal (Jeball Ali) |
February-13 |
| 102 |
Termination Assistance for 132kV,1Cx630 Sq.mm Cu, XLPE cable |
Alstom Grid, Dubai-UAE |
DEWA Contract no: CE/716/2008,in the substation of Bird |
January-13 |
| 103 |
11 / 3.3 KV Termination |
GS Engineering & Construction |
Takreer - RRE3 Project |
February-13 |
| 104 |
11KV Termination |
Al Yasat |
ZADCO |
February-13 |
| 105 |
11&3.3 kV Cable Jointing/Termination |
GS Engineering & Construction |
Takreer - Ruwais |
March-13 |
| 106 |
Installation of cable into the tray, 11kV panel, testing & Commissioining |
Altajir glass factory |
Jebel Ali-Dubai-UAE |
On going |
| 107 |
Dismantling of 11kV switchgear, installation of termination kit, Preparation of SLD, relay setting calculation of 11kV Switchgear |
Star Energy Resources LTD |
Star Energy Tanking- Jebel Ali |
On going |
| 108 |
Diversion of 11kV cable works-15,000mtr and Route length-1500mtr, Installation of jointing kit -150 Nos and Civil works |
Todini Costruzioni Generali S.p.A. |
RBB1I3A, Comprehensive Improvement of the Pareliel Roads - Contract 3A |
On going |
| 109 |
Installation of LV cable laying into the trench, tray and duct- 15,000 mtr and installation of termination kit -1500 Nos |
Al Naboodha -Dubai-UAE |
Air show 2013- Jebel Ali |
On going |
| |
TESTING |
|
|
|
| 1 |
33kV Shetah fault location, repairing & testing |
DANWAY |
Abu Dhabi |
April-10 |
| 2 |
132kV cable ,630sqmm LV , HVAC & PD measurement test - 9circuits |
DANWAY |
132kV DEWA S/S - CE/448D/07 |
January-11 |
| 3 |
11kV Cable testing |
ARCHIRODON Construction (Overseas) Co S.A , |
Mirfa 1 sea water intake & outfall project |
December-10 |
| 4 |
132kV,630sqmm , GIS S/E - TRF S/E PD measurement -1 ckt - Iinernal |
Emirates Electrical Engineering L.L.C |
Nad Al Sheba 132kV S/S |
May-10 |
| 5 |
132kV GIS S/E-GIS S/E PD measurement- 1ckt- external |
ETA Star International L.L.C |
Qaryat- Jumeirah -Village S/S , CE/220F/2007 |
May-10 |
| 6 |
132kV GIS S/E-GIS S/E PD measurement -1ckt External |
Emirates Electrical Engineering L.L.C |
CE/509/2008 |
May-10 |
| 7 |
220kV cable LV test -2 circuits |
Taihan- Dubai _UAE |
Tender no:113/2007,Construction of Barka /Felayj circuit 3&4 |
April-10 |
| 8 |
132kV sheath fault location & repairing |
DODSAL engg & contracting Pte Ltd |
Fijairah Phase2 water Transmision system |
March-10 |
| 9 |
132kV ,630sqmm cable HVAC test - 3circuit |
Al Mostajed Technologies Co.L.L.C |
JXB1/INF/043- Dubai World Central Phase1- Airfiel & Infrastructure DLC PhaseII |
June-10 |
| 10 |
132kV ,630sqmm cable cable sheath & drum test - 11ckt & 5drums |
AREVA |
CE/496A/2007 -UES 400/132kV Horse Race S/S |
October'10 |
| 11 |
132kV,2000sqmm, Cu,XLPE, Cable ,circuit - LV & HVAC Tetsing - 1ckt |
Taihan Electric Wire Co Ltd |
132kV Power Supply to Oman Industrila Complex - Sohar |
August-10 |
| 12 |
132kV GIS S/E PD Measurement -1no |
AREVA - Dubai |
132kV Jumirah Park S/S |
October-10 |
| 13 |
132kV GIS S/E PD Measurement -2no |
ETA Dubai |
132kV Bohaira S/S |
October-10 |
| 14 |
132kV GIS HVAC & PD Measurement |
L&T Dubai |
132kV INVR & JHRC S/S |
on going |
| 15 |
132kV cable HVAC + PD Measurement -1no |
AREVA- Dubai |
132kV DDP J Park S/S |
December-10 |
| 16 |
11kV Cable testing |
ARCHIRODON Constrcution (Overses) Co S.A , Abu Dhabi |
Mirfa 1 sea water intake & outfall project |
December-10 |
| 17 |
LV, HVAC & PD test of 132kV cable - 8 circuits |
NCC Abudhabi/DEWA |
DEWA Contrcat # CNE/0209/2009- Under grounding of 132kV OHL at Al Al Barsha |
January-11 |
| 18 |
LV & HVAC test of 132kV cable - 4 circuits |
National Contrcating Co Ltd, Saudi |
SEC-EOA Contrcat no: 30831211/00 |
On going |
| 19 |
HVAC Resonace frequency test for 132kV GIS - 2nos, 132kV Cable - 6ckts |
Larsen & Toubro (Oman) L.L.C |
Constrction of 132/33kV SFZ and IWPP Grid Substation |
On Going |
| 20 |
LV Cable (4Cx150sqmm) fault location & repairing |
Marmum Dairy Farm LLC |
|
February-11 |
| 21 |
PD measuremnet for 132kV cable accessories |
Emirates Trading Aency , Dubai |
DEWA Contrct no;CE/448A/2007 - 132/11kV Mountain S/S |
February-11 |
| 22 |
PD measuremnet for 132kV cable accessories |
Emirates Electrical Engineering L.L.C |
DEWA Contrct no;CE/448C/2007 - 132/11kV New Gharoud S/S -IDT2 & 3 |
April-11 |
| 23 |
HVAC Resonace frequency test for 132kV GIS -1no |
Japan AE Power system Corporation |
132kV GIS at TEJARA Town S/S |
May-11 |
| 24 |
HVAC Resonace frequency test & LV test for 132kV cable-8 ckts, PD test-132kV Cable - 2 Bays |
BAHWAN Engineering Co LLC/Power Links Intl |
Upgrading Bousher Grid S/S, Construction of 132kV Grid station at Yitti |
On going |
| 25 |
HVAC testing(VLF) for 33kV cable-3ckts |
Centaur Electro-Mechanical Contracting |
33kV cabling works for MOT power supply in Fujairah-Abudhabi crude oil pipeline project. |
August-11 |
| 26 |
HVAC Resonace frequency test for 132kV Cable -1ckt |
Al Mostajed Technologies Co.L.L.C |
E4-2009/132kV, HVAC test for Naimiya-AJPS Ckt- Ajman& RAK |
August-11 |
| 27 |
HVAC Resonace frequency test & PD test for 132kV cable-6 ckts |
L&T ECC Division-Abudhabi-UAE |
132kV GIS & TRF for INVR&JHRC S/S |
On going |
| 28 |
HVAC Resonace frequency test -132kcable-2 ckts, & 132kV temporary termination - 12 Nos |
L&T Dubai |
DEWA Contract no: CE/0286A/2010, in Salahudin - BNYS Ctks |
August-11 |
| 29 |
HVAC Resonace frequency test & PD test for 132kV cable-29 ckts, LV test-132kV Cable - 17 Ckt, 11kV cable HV test-84 Nos of cable |
Alstom Grid, Dubai-UAE |
DEWA Contract no: CE/716/2008,in the substation of LBAC, MCLB,SKLN,KFAF,KWNJ,OMTN,JAIN,WHSP-Dubai-UAE |
On going |
| 30 |
PD measuremnet for 132kV cable accessories -12 nos GIS S/E |
Al Mostajed Technologies Co.L.L.C |
Airport Resisdent 132/11-S/S |
September-11 |
| 31 |
HVAC Resonace frequency test & PD test for 132kV,1Cx630 Sq.mm cable-46 ckts |
L&T ECC Division-Abudhabi-UAE |
DEWA Contract no: CE/0096/2009 |
On going |
| 32 |
HVAC Resonace frequency test for 132kV GIS -1no |
Japan AE Power system Corporation |
132kV GIS at Jadaf substation S/S |
December-11 |
| 33 |
PD measuremnet for 132kV cable accessories -2 Group - GIS |
Emirates Electrical Engineering L.L.C |
DEWA-CE/0348B/2010(1268) |
December-11 |
| 34 |
Bentonite Filling |
Alstom Grid, Dubai-UAE |
MEW/EO1/2003/V04 - DHAID |
March-12 |
| 35 |
220kv cable sheath testing & fault location |
Alstom Grid, Dubai-UAE |
Takreer - Ruwasis S/S |
Februavary-12 |
| 36 |
Rewinding of BRUGG cables at Al Dhaid sitei |
Alstom Grid, Dubai-UAE |
N- 6275 - Tawyeen S/S |
March-12 |
| 37 |
4C x300 Sq.mm LV Cable Sheath fault location in the laid cables |
Scantec International LLC |
LV sheath fault locating at Jumeriah Park project - Nakheel Villas |
Februavary-12 |
| 38 |
132kv Cable Ssheat test Fault location |
Alstom Grid, Dubai-UAE |
CE/496A/2007 -UES 400/132kV Horse Race S/S |
Februavary-12 |
| 39 |
220 kv 1Cx 1200 sqmm Cable Sheath Test |
ALSTOM |
TAKREER - RUWAIS S/s |
February-12 |
| 40 |
33kV Cable Fault Testing & Repairing |
Kentech International Limited |
GASCO, Abu Dhabi |
May-12 |
| 41 |
33kV Cable Fault Testing & Repairing |
Kentech International Limited |
GASCO, Abu Dhabi |
June-12 |
| 42 |
132 kV Fault detection and repairs |
EMCO, Abu Dhabi |
Abu Dhabi Oil Refining Company (Takreer) |
August-12 |
| 43 |
33 kV Cable testing (HVAC,VLF) |
National Contracting Co Ltd |
ADCO-ASAB FFD Project 14333 |
August-12 |
| 44 |
Cable Fault Location 33 KV CABLE |
Petrofac GS JV |
Petrofac - GS Joint Venture JI -197 JV |
October-12 |
| 45 |
Cable Fault Location 11 KV CABLE |
Kharafi National |
IGD Habshan - 5 Process Plant Project |
October-12 |
| 46 |
LV CABLE FAULT LOCATION c/w Repair |
Borouge - Abu Dhabi |
Borouge - Ruwais |
November-12 |
| 47 |
Cable Fault Location 33 KV CABLE |
Danway Electrical & Mechanical Engineering LLC |
TAKREER - RUWAIS S/s |
November-12 |
| 48 |
LV Cable Location |
Kentech International Limited |
ADCO - ASAB |
December-12 |
| 49 |
HVDC, IR & Phase check test for 8.5/1.5kV, 3Cx150 Sq.mm marine cable |
Lamprell Energy Ltd - Dubai - UAE |
CN/10/1105 - Living Quarters & Utility platforms |
May-12 |
| 50 |
HVAC and Cross bonding verification for 115kV, 1Cx1600 Sq.mm, Cu, XLPE |
National Contracting Co Ltd, Saudi |
SEC - EOA Contract no: 31033077/00 |
On going |
| 51 |
VLF testing for 11kV, 3Cx300 Sq.mm cable |
ETA - PPD |
EMAL |
July-12 |
| 52 |
Precommissioning test and sheath fault location for 132kV, 1Cx630 Sq.mm cable |
L&T- Dubai-UAE |
CE/0096/2009/217 |
September-12 |
| 53 |
Drum test and shath test for Village S/S |
Alstom Grid, Dubai-UAE |
CE/220A/2012 |
November-12 |
| 54 |
IR and HVAC test for 11kV,3Cx0 Sq.mm Cu/XLPE cable |
VOLTAS Limited |
DIFC- Project |
November-12 |
| 55 |
HVAC Test for 132kV, 1Cx630 Sq.mm Cable - 6 Ckts, Preparation of 132kV cable end with supply of temporary termination kit to facilitate for HVAC test- 72 Nos, Pre Commissioning for 132kV calbe - 6 Cks |
Scan powr Projects- Dubai-UAE |
Al Sufouh Transit system LS-3 & LS-5 |
On going |
| 56 |
HVAC Test for 220kV, GIB - 6 Nos, Voltage applied -380kV |
Samsung Engineering co.Ltd |
Takreer PRE U&O Projects |
On going |
| 57 |
Performing PD Mesurement Test |
Emirates Electrical Engineering LLC |
DEWA CE/067A/2011 (1271) |
On going |
| 58 |
LV Cable Fault Location |
Kharafi National |
Al Muna School |
December-12 |
| 59 |
Cable Fault Location |
Al Borogue |
Borouge - Ruwais |
January-13 |
| 60 |
LV CABLE FAULT LOCATION |
Gasco |
Gasco - Ruwais |
January-13 |
| 61 |
Installation Of Jointing Kits |
Kharafi National |
Al Muna School |
January-13 |
| 62 |
220 KV Cable Fault Location |
Hyundai Engineering & Construction |
Takreer - Ruwais |
January-13 |
| 63 |
132 KV Cable Fault Location |
Alstom Engineering |
Borouge - Ruwais |
January-13 |
| 64 |
33 KV Cable Fault Location |
Target Engineering |
Takreer - Ruwais |
January-13 |
| 65 |
132 KV HVAC Testing |
L&T Construction |
Sir Baniyas Island - TRANSCO |
February-13 |
| 66 |
132 kV-PD Measurement Test |
Prysmian Powerlink |
EMAL - Abu Dhabi |
February-13 |
| 67 |
132 kV Cable Laying & HVAC Testing |
L&T Construction |
Taweelah S/S - TRANSCO |
February-13 |
| 68 |
220 KV Cable Fault Location |
Hyundai Engineering & Construction |
Takreer - Ruwais |
March-13 |
| 69 |
11kV Cable Fault Location |
Danway Electrical & Mechanical Engineering LLC |
Takreer - Ruwais |
March-13 |
| 70 |
Sheath fault location for 220kV, 1Cx1200 Sq.mm with repairing of sheath fault location |
Alstom Grid, Dubai-UAE |
Takreer-5631- Ruwais S/S |
January-13 |
| 71 |
LV Testing for 132kV, 1Cx630 Sq.mm-3 Ckt, HVDC testing for 11kV, 1cx800, 500, & 185 Sq.mm cable |
Alstom Grid, Dubai-UAE |
TDG-2006-08 at GLFS S/S |
January-13 |
| 72 |
Performing PD Mesurement Test |
Emirates Electrical Engineering LLC |
E-0126/CE/0509A/2008 |
On going |
| 73 |
Precommissioning test for 132kv cable - 16 Ckt, Sheath Fault location -10 Nos, Termporary termination for 132kv, 1Cx630 Sq.mm Cable-60 Nos |
L&T Limited |
CE/0096/2009 |
On going |
| 74 |
Performing PD Mesurement Test - 3 Nos GIS &3 Nos-TRF- 6 Location |
Prysmian |
|
February-13 |
| 75 |
Performing PD Mesurement Test - 3 Group |
ETA-Dubai-UAE |
R881/1B Comprehensive improvement of the parallel roads Phase-1B-Flyover along Umm Suqeim road |
On going |
| 76 |
Performing PD Mesurement Test -2Group (Group consist of 3 Nos of cable) |
Emirates Electrical Engineering LLC |
DEWA CE/0348B/2010 (1268 CAB) |
March-13 |