Route survey, preparation of conceptual and detailed designs, engineering/shop drawings for construction, technical assistance in sourcing and procurement, supply of materials, performance onsite installation, pre commissioning tests, High Voltage Resonance Frequency Test, Partial Discharges test, location and repairing of faults on cable & sheath including identifying the causes and all civil reinstatement works for the entire of range of high voltage cables from 11kV to 400kV Level

Reference

PLQ CONTRACTING L.L.C

Past and Current Experience List/Job Profiles


Sl.No Description  Contractor/consultant/ Customer  Project Reference Status
 
PROJECTS 
1 Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -30nos Dubai Mall S/S-3nos, Garden Group 1-3nos, Al Mamzar -3nos,Old Town-3nos, Garden-Group 2-3nos, Estihmar-Group2-3nos., BRES - Group 1-3nos, SK Zayed Road Tower3nos, Old Town Group 2-3nos, Burj Dubai-3nos. CCC GmbH, Germany/DEWA CE/207B/2009 July-09
2 Installation of 11kV Indoor cable termination kit ETA Star International -Dubai Emirates Aluminium August/09
3 Supply & Installation of 33kV,1Cx1200sqmm Cu,PILC cable Danway-Dubai DUBAL Jul-09
4 Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -12nos and 132kV TRF S/E -12nos CCC Germany /ETA /DEWA CE/288C/2007- Silicon Oasis S/S August/09
5 Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -30nos CCC GmbH, Germany/DEWA CE/207B/2009   August/09
6 Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -9nos and 132kV TRF S/E -9nos CCC GmbH, Germany/DEWA CE/288C/2007-Dhiyafa 132kV S/S September/09
7 Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -30nos CCC GmbH, Germany/DEWA CE/207B/2009 December/09
8 132kV Cable shetah testing , sheath fault location & Repairing AREVA 132kV JARA S/S October'09
9 Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -9nos and 132kV TRF S/E -9nos CCC GmbH, Germany/DEWA 132KV -BOHAIRAH S/S Nov/09
10 Design & Engineering works for 132kV XLPE cable route & accessories NCC Abudhabi/ADCO ADCO PROJECT No:14333 Octtober 2010
11 Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -15nos and 132kV TRF S/E -15nos CCC GmbH, Germany/DEWA CE/107A/2007 -Lost City Substation January/10
12 Installation of 11kV Indoor cable termination kit & cable testing Bin Ghalib   April/10
13 Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -15nos and 132kV TRF S/E -15nos CCC GmbH, Germany/DEWA CE/107A/2007 -Lost City Substation December/09
14 Installation of 132kV GIS S/E for SF6 switch gear type EG123-145kV -21nos and 132kV TRF S/E -21nos CCC GmbH, Germany/DEWA NAS/A608/2007 , SHBA S/S & Qaryat Jemirah S/S April/10
15 11kV Cable installation from Substation -8 to common utilities Tunnel to RMU Rooms to Transformers , inclding termination , Jointing & CIVLE WORKS - Cable laying 56KM, civil work 3kM Total Electrical & Mechanical LLC Proposed evelopment & construction of Nad Al Sheeba Race course on parcel ID 600 6888 for M/S Meydan February/10
16 132kV Cable route design works NCC Abudhabi/DEWA DEWA Contrcat # CNE/0209/2009- Under grounding of 132kV OHL September/10
17 Installation of 132kV cable including , civil works , LV, HVAC & PD test of 132kV cable NCC Abudhabi/DEWA DEWA Contrcat # CNE/0209/2009- Under grounding of 132kV OHL On going 
18 11kV cable diversion work at AlWarka 4 TUNB Building Contg Al Warka -4 March/10
19 LV Cable laying ARAR Utility company LLC Dubai Metro Green Line at Al Quasais Depot April/10
20 11kV cable diversion work at DREC Villa Project Al Shafar General contracting LL DREC Villa Project April/10
21 132kV Cable installation with Supports AREVA 400kV/132kV S/S t Al Barsha -CE/496A/2007 September/10
22 11kV cable diversion work at DIERA Project Islamic Affair & Charitable Activities Deaprtment   October/10
23 11kV & 33kV cable joints Prime Electromechanical   May/10
24 Installation of 11kV termination kit -14nos Al Mirza Electro M Cont Est.echanical   May/10
25 Installation of LV cantrol cable Danway EMAL May/10
26 11kV Cable diversion work Herald Contractiong Co LLC R503 Emirates hills 2nd Village Phase2 (Plot 388-101) August/10
27 LV cable work Al Tatwir Contracting L.L.C Site C-180- Al Khawneej August/10
28 11kV cable diversion work & demolition of SS at DREC Villa Project Al Shafar General contracting LL DREC Villa Project April/10
29 11, 22kV Cable Termination & Tetsing Lamprell CN/09/1102 - Aquila Top Sided Modules September/10
30 LV & 22kV Cable Installation Appha Power Electro Mechanical Contracting LLC, Consultant-OGER, Manin Contrcator-THERMO ADFC - Abu Dhabi October/10
31 Demolition of substation 531 and Relocation of Existing HV-LV cable on the plot 353-201 Al Shafar General contracting LL DREC Villa Project September/10
32 11kV & 33kV Cable termination , 11kV -25nos, 33kV-6nos   Al Zarooni Electro Mechanical LLC October/10
33 Installation of Joint & ODSE for 115KV,1Cx1200sqmm ,Cu,XLPE cable National Contracting Co.Ltd , KSA SEC-EOA Contract no: 30831211/00,installation of 115kV U/G cable between Jawatha BSP and North Mubarraz & Al-Masoudi S/S & other works November 201 0
34 Installation of ODSE for 132kV, 630sqmm cU XLPE cable -6nos CCC GmbH, Germany/NCC/DEWA DEWA Contrcat # CNE/0209/2009- Under grounding of 132kV OHL November 201 0
35 Installation of 33kV , 3Cx400sqmm PILC - XLPE Transition Joint GEECO Mechanical & Electrical Limites DEWA On going
36 11kV Cable testing ARCHIRODON Constrcution (Overses) Co S.A , Abu Dhabi Mirfa 1 sea water intake & outfall project December/09
37 Suuply & installation of 33kV Cable Joints - 1200sqmm - 500sqmm Danway Elecrical & Mechanical Engg LLC Dubal On going
38 Installation of 132kV Joints & ODSE - 192nos National Contrcating Co Ltd, Saudi SEC-EOA Contrcat no: 30831211/00 On going
39 132kV ,1200sqmm Cu XLPE cable laing , ast for accessories installtion , LV & HVAC tets for 132kV cable -28kM National Contrcating Co Ltd, Abu Dhabi ADCO-ASAB Full Fields development project- ADCO Contract no 7118.01/EC 10714/ADCO Project No:14333 On going
40 Installation of 132kV,1200sqmm -720mtr, 220kV,1200sqmm Cu XLPE cable -600mtr AREVA , Dubai Dhaid V04 S/S On going
41 Installation of 11kV cable - 6820mt & Cable trench -3300mtr Kazarooni Co.(L.L.C) Roads & infrstructure work for Jumierah Heights On going
42 Installation of 3.3kV indoor termination & testing-48nos Emirtaes Electrical & Instrumnetatio LLC ADMA OPCO, Das Island Abu Dhabi On going
43 Design, Supply & installation of Steel structure & foundation 132kV & 66kV - ODSE -24nos & SA- 30nos Jazeera Emirates Power , Dubai-UAE Qatar Power Transmission System Expansion Phase 9 - Substation (GTC/240)  On going
44 Installation of 132kV & 66kV GIS S/E & ODSE-150nos and LV & HVAC testing - 25ckts Jazeera Emirates Power , Dubai-UAE Qatar Power Transmission System Expansion Phase 9 - Substation (GTC/240) On going


 

Sl.No Description  Contractor/consultant/ Customer  Project Reference Status
 
TESTING
1 HVAC Test for 132kV GIS -1no  L&T Oman  Mobella 132kV/33kV  Transmission system - Tender no: 159/2004 November/06
2 LV  &  HVAC test for 132kV Cable circuits between GIS &TRF -1no L&T Oman  132kV Power Supply to OMIFCO from Sur Grid S/S November/07
3 HVAC Test for 132kV GIS -1no, LV  &  HVAC test for 132kV Cable - 6circuits L&T Oman  132./33kV, Saham Grid station ansd associated transmission system  at saham area North Batinah  - Tender no: 259/2007 September/09
4 LV & HVAC Tes for 132kV ,2500sqmm Cable cicuit - 6 circuits L&T Oman  132/11kV Azaiba Coastal Grid Station and associated Transmission System- Tender no: 190/2007 October'09
5 LV & HVAC Tes for 132kV,2500sqmm  Cable cicuit - 6 circuits L&T Oman  Replacing portion  of 220 and 132kV over head lines in Muscat Governorate with cable ,Phase- ,Part-1, Tender 11/2008 October/10
6 33kV Shetah fault location, repairing & testing  DANWAY  Abu Dhabi  April/10
7 132kV cable ,630sqmm LV , HVAC & PD measurement test - 9circuits DANWAY 132kV DEWA S/S - CE/448D/07 January/11
8 220kV cable,2500sqmm  HVAC test - 2circuits  Civil CO -Oman  Tender no:113/2007,Construction of Barka /Felayj circuit 3&4 April/10
9 132kV,630sqmm , GIS S/E - TRF S/E PD measurement -1 ckt  - Iinernal Emirates Electrical Engineering L.L.C Nad Al Sheba 132kV S/S  May/10
10 132kV GIS S/E-GIS S/E  PD measurement- 1ckt- external ETA Star International L.L.C Qaryat- Jumeirah -Village S/S , CE/220F/2007 May/10
11 132kV GIS S/E-GIS S/E  PD measurement -1ckt External Emirates Electrical Engineering L.L.C CE/509/2008 May/10
12 220kV cable LV test -2 circuits Taihan- Dubai _UAE Tender no:113/2007,Construction of Barka /Felayj circuit 3&4 April/10
13 132kV sheath fault location & repairing DODSAL engg  & contracting Pte Ltd Fijairah Phase2 water Transmision system March/10
14 132kV ,630sqmm cable HVAC test - 3circuit  Al Mostajed Technologies Co.L.L.C  JXB1/INF/043- Dubai World Central Phase1- Airfiel & Infrastructure DLC PhaseII June/10
15 132kV ,630sqmm cable cable sheath & drum test - 11ckt & 5drums AREVA  CE/496A/2007 -UES 400/132kV Horse Race S/S  October'10
16 132kV,2000sqmm, Cu,XLPE, Cable ,circuit - LV & HVAC Tetsing - 1ckt Taihan Electric Wire Co Ltd 132kV Power Supply to Oman Industrila Complex - Sohar  August/10
17 132kV GIS Testing & 132kV Cable Tetsing - 2 ckt L&T Oman  132/33KV Grid Station & associated transmission system in Nakhal Area  September/10
18 132kV GIS  S/E PD Measurement -1no AREVA - Dubai 132kV Jumirah Park S/S  October/10
19 132kV GIS S/E PD Measurement -2no ETA Dubai  132kV Bohaira S/S  October/10
20 132kV GIS HVAC & PD Measurement  L&T Dubai  132kV INVR & JHRC S/S  on going 
21 132kV cable HVAC + PD Measurement -1no AREVA- Dubai  132kV DDP J Park S/S  December/10
22 11kV Cable testing  ARCHIRODON Constrcution (Overses) Co S.A , Abu Dhabi  Mirfa 1 sea water intake & outfall project  December/10
23  LV, HVAC & PD test of 132kV cable - 8 circuits  NCC Abudhabi/DEWA DEWA Contrcat # CNE/0209/2009- Under grounding of 132kV OHL  at Al Al Barsha  January/11
24  LV & HVAC  test of 132kV cable - 4 circuits  National Contrcating  Co Ltd, Saudi  SEC-EOA Contrcat no: 30831211/00  On going 
25 HVAC Resonace frequency test for 132kV GIS - 2nos,  132kV Cable - 6ckts Larsen & Toubro (Oman) L.L.C Constrction of 132/33kV SFZ and IWPP Grid Substation  On Going 
26 LV Cable (4Cx150sqmm)  fault location & repairing  Marmum Dairy Farm LLC   February/11
27 PD measuremnet for 132kV cable accessories  Emirates Trading Aency , Dubai DEWA Contrct no;CE/448A/2007 - 132/11kV Mountain S/S  February/11
28 PD measuremnet for 132kV cable accessories  Emirates Electrical Engineering L.L.C DEWA Contrct no;CE/448C/2007 - 132/11kV New Gharoud S/S -IDT2 & 3 On Going 
29 LV & HVAC Resonace frequency test for 132kV  Cable -2ckts, 220kV cable - 4ckts Larsen & Toubro  Electromech L.L.C, Oman /PLI 220/33kV Grid station and associated 22kV Transmission line at Al Sowadi ( Blue city area) Tender no:144/2009 On Going 
30  HVAC Resonace frequency test for 132kV GIS -1no Japan AE Power system Corporation 132kV GIS at TEJARA Town S/S  On Going